Make HomePage BookMark Us
 
Login
Name :  
Passwrd :  
   
   
Register Now!
Forgot Your Pass?
www.idrw.org / Indian Defense Research Wing » N&S America » Boeing's 1st P-8A Poseidon Moves From Final Assembly to Preflight
Menu
India Europe
Asia&Pacific N&S America
Africa Contact Us
Exclusive RSS 2.0
 
Advanced Search
Calender
«    August 2008    »
 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Latest News
» After hiccups, indigenous Light Combat Helicopter set t ...
» Agni-V to be ready by 2010
» Gorshkov launched in water for trials, delivery by 2011 ...
» Light Combat Aircraft to be delivered by 2011: Antony
» Russian aircraft carrier ready in 2012 if India pays $2 ...
» Saab Challenge: Gaining Traction for Gripen NG
» IAF to launch its satellite: Air Chief
» Xianglong UAV copy of Global Hawk? Developed By China
» Navy’s sub induction plan suffers blow
» Indian warship fights off pirates in Gulf of Aden
Poll
Should Kaveri engine project be scrapped ??

Yes
NO
Go for a Joint venture on Kaveri
Go for a Joint venture on new Engine
Archives
November 2008 (41)
October 2008 (51)
September 2008 (53)
August 2008 (83)
July 2008 (82)
June 2008 (98)
May 2008 (79)
April 2008 (111)
March 2008 (65)
February 2008 (133)
January 2008 (103)
December 2007 (86)
November 2007 (82)
October 2007 (130)
September 2007 (122)
August 2007 (136)
July 2007 (102)
June 2007 (90)
May 2007 (135)
April 2007 (89)
Change Skin
Sponsors
 
 

N&S America : Boeing's 1st P-8A Poseidon Moves From Final Assembly to Preflight
 
BY : Boeing PR

Boeing's 1st P-8A Poseidon Moves From Final Assembly to Preflight




Boeing [NYSE: BA] Integrated Defense Systems (IDS) and Boeing Commercial Airplanes (BCA) employees gathered today in Renton, Wash., to celebrate the completion of final assembly on the first P-8A Poseidon for the U.S. Navy and its move to preflight work.

IDS and BCA are building the P-8A, a military derivative of the 737-800, on a third final assembly production line in Renton. The third line takes advantage of the proven efficiencies, manufacturing processes and performance of the highly reliable Next-Generation 737.

"We're proud to have completed final assembly on the first P-8A Poseidon," said Mo Yahyavi, vice president and P-8 program manager for BCA. "Our objective on the P-8 program is to provide the Navy with the world's most advanced maritime patrol and reconnaissance aircraft. BCA and IDS working together as one team will be able to do just that."

IDS will now focus on calibrating the flight-test instrumentation onboard the aircraft before moving it to Boeing Field in Seattle early next year for systems integration and additional testing.

"Program milestones, both big and small, are met daily thanks to our outstanding Poseidon team," said Bob Feldmann, vice president and P-8 program manager. "Since the start of final assembly in late March, the team has met all assembly milestones, including wing-to-body-join and start of the moving line in May, completion of full-power testing and engine installation in June and, most recently, engine run."

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is slated for 2013.
 
 
 
   
 
 
Dear Visitor You have Not Logged In Please Register And Then Login.
 
 
  • Boeing Begins P-8A Moving Assembly Line
  • Boeing Begins Final Assembly of 1st P-8A Poseidon
  • US Navy asks Boeing to accelerate P-8A deliveries
  • Boeing Completes 200th P-8A Live-Fire Shot
  • A400M reaches final assembly line
  •  
     
    Comments (0)  Print
     
     
    Add comments
       
     

     

    Fair Use Notice This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. The material is being made available in an effort to advance understanding arms trade activities, for non-profit research and educational purposes only. We believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. If you wish to use this copyrighted material for purposes of your own that go beyond 'fair use,' you must obtain permission from the copyright owner. For more information go to http://www.law.cornell.edu/uscode/html/uscode17/usc_sec_17_00000107----000-.html This is a completely non-commercial site for private personal use. No fee is charged, and no money is made off of the operation of this site - we have limited ads to cover our operational cost we don't have a donation button neither we accept any. All material that is not produced by the individuals who use this site will be placed under the directory /fair-use or /media under this domain.